Technical Specifications
  • Line of action::Coal power plant
  • Power::1,158 MW
  • Location::Carboneras (Almería)
  • Timeline::2015-2017
  • Client::Enel
  • Project::Adaptation of installations to the Industrial Emissions Directive (IED): assembly during operation of reinforcement in gas ducts and precipitator of group 1. groups 1 and 2: prefabrication and supply of gas ducts for the circuits associated to the DeNOX system (GGH-Chimney-DeSOX and SRC-boiler-APH)