Technical Specifications
  • Line of action::Solar power plant
  • Location::El Carpio (Córdoba)
  • Power::50 MW each
  • Year::2011
  • Client::Inabensa
  • Scope::Prefabrication and assembly of HTF pipes and supporting structures at solar field. Assembly of absorbent pipes. Hydraulic testing.

Leave a Reply

Your email address will not be published. Required fields are marked *