Technical Specifications
  • Line of action::Solar power plant
  • Location::Logrosan (Caceres)
  • Power::50 MW each
  • Timeline::2011-2013
  • Client::Inabensa
  • Scope::Prefabrication and assembly of HTF pipe and supporting structures at solar field. Assembly of absorbent pipes. Hydraulic testing. Assembly of pipes, supporting structures and power island systems. Repairs and maintenance work since the work was carried out.